Depot Charging Scheme Grant - Limited Time Only!
The Depot Charging Scheme provides support to fleet operators on the costs of installing charging infrastructure for electric HGVs, vans and coaches at fleet depots.
Get up to a maximum of £1 million for EV charging
IMPORTANT INFORMATION
Eligibility:
To apply for this grant:
- You must be a registered fleet operator, operate in the UK, and have been doing so for at least 1 year at the time of the application.
- You must own your depot or have consent from your landlord for chargepoints to be installed at the site(s) listed in the application.
- You must own, lease, or order at least 1 battery electric van, HGV and/or coach as part of your vehicle fleet.
- You must be able to complete the installation of chargepoints at your depot site(s) by 31 March 2026.
- You must have sufficient grid capacity at your depot site(s) to support charging by 31 March 2026.
Key Dates:
- Scheme launch: 16 July 2025
- Scheme close: The grant will close either when funding has been exhausted or by 28 November 2025 (whichever is sooner).
- Monitoring and claims window opens: 1 September 2025
- All infrastructure works to be completed: 31 March 2026
- Monitoring and claim window closes: 31 May 2026
Grant will close either when funding has been exhausted or by 28 November 2025. Speak to us today!
Book a consultation with our team today!
Our team will explain the process and how to maximise the amount of funding you can receive to future-proof your depots.